Case Study
Gibraltar
19th March 2018

Case Study: Gibraltar

Contract period: 1998

Contract value: £1.2 million

What was involved: Supply of machines and operators for face stabilisation in Gibraltar.

Project involved the shipment of equipment overland form the UK for a 6 month project period.

All operators and maintenance personnel were provided by Hawk Plant.

Machinery Used:

2 x Komatsu PC300 Excavators

2 x Moxy MT30 Dumptrucks

1 x Komatsu D65EX Dozer

1 x Hydraulic Hammer

5 x Operators